1 |
2-07-005-13 |
SPECIFICATION FOR ELECTRONIC DIFFERENTIAL PRESSURE & PRESSURE TRANSMITTER |
2 |
2-03-001-20 |
DESIGN PARAMETERS FOR GALLERIES AND TUNNELS FOR BELT CONVEYORS IN STEEL PLANTS |
3 |
2-03-002-20 |
GENERAL DESIGN FEATURES OF JUNCTION HOUSES FOR BELT CONVEYORS |
4 |
2-03-004-20 |
DESIGN PARAMETERS FOR IDLERS AND IDLER SETS |
5 |
2-03-005-20 |
GENERAL DESIGN FEATURES OF JUNCTION HOUSES FOR BELT CONVEYORS |
6 |
2-03-006-20 |
SPECIFICATION FOR SYNTHETIC FABRIC REINFORCED RUBBER. CONVEYOR BELTING - GENERAL PURPOSE |
7 |
2-03-008-20 |
DESIGN AND FABRICATION PARAMETERS FOR TECHNOLOGICAL STRUCTURES FOR BELT CONVEYORS |
8 |
2-03-009-20 |
GENERAL PARAMETERS FOR MAINTENANCE FACILITIES IN CONVEYOR SYSTEM |
9 |
2-03-019-20 |
DESIGN PARAMETERS FOR SHUTTLE CONVEYOR |
10 |
3-03-001-00 |
Registration of contractors for Job/Works Contracts (Indigenous) (Amendment 1) |
11 |
2-08-005-13 |
Guidelines for IT infrastructure distribution,maintainace and ownership policy |
12 |
2-08-004-13 |
Guidelines for organisational email setup |
13 |
2-08-003-13 |
Guidelines for data exchange and remote access across server |
14 |
2-08-002-13 |
Guidelines for pc based data usage and security |
15 |
3-02-004-18 |
Code of practice for storing, handling and reclamation of lubricants |
16 |
3-02-003-18 |
Code of practice for mounting and dismounting of bearings (Hindi version also available) |
17 |
3-02-002-18 |
Method of reconditioning of sinter plant pallets |
18 |
3-02-001-18 |
Method of storage of semi-finished products like ingots, blooms, billets, slabs |
19 |
3-02-010-18 |
Method of storage of flat products |
20 |
3-02-008-18 |
Method of periodic maintenance of WDS-6 locomotives in steel plant |
21 |
3-02-006-18 |
Definition of terms relating to maintenance & equipment performance |
22 |
3-02-007-18 |
Method of packing, identification & storage of finished long products |
23 |
3-02-005-18 |
Method of reconditioning of blast furnace bells |
24 |
3-02-013-18-A |
Method of permanent way inspection and maintenance practices of rail track (Part-A) |
25 |
3-02-014-18 |
Code of practice for revamping of EOT cranes |
26 |
3-02-013-18-B |
Method of permanent way inspection and maintenance practices of rail track (Part-B) |
27 |
3-02-012-18 |
Wear particle analysis procedure for establishing a system |
28 |
3-02-011-18 |
Code of practice for vibration monitoring |
29 |
3-02-019-18 |
Code of Practice for Reclamation of Blast Furnance Hot Blast Valves |
30 |
3-02-018-18 |
Reclamation of Roll Table Rollers |
31 |
3-02-021-18 |
Code of Practice for Raw Material Spillage Control |
32 |
3-02-017-18 |
Reconditioning of coke crusher roll (for base mix preperation) |
33 |
3-02-015-18 |
Code of practice for inspection of Industrial Building Steel Structures. |
34 |
3-01-001-18 |
Vendor Registration and Renewal (Third Revision) |
35 |
3-01-012-98 |
Specification for HDPE sheets |
36 |
3-01-008-18 |
Format for Tender Enquiry Proposal |
37 |
3-01-010-98 |
Specification for HDPE bags |
38 |
3-01-002-18 |
Tender evaluation for stores and spares (second revision) |
39 |
3-01-003-18 |
Guidelines for Vendor Rating and Vendor Development (Second Revision) |
40 |
2-07-004-11 |
Specification for control valves and actuators(Third Revision) |
41 |
2-07-002-93 |
Guide for installation of systems - Withdrawn |
42 |
2-07-001-87 |
Guide for tests for hardware and enclosures for different environments - Reaffirmed in 1992 |
43 |
2-07-015-15 |
Specification for programmable Logic Controller(First Revision) |
44 |
2-07-014-13 |
Guide For Central Instrumentation and Automation Laboratory (Second Revision) |
45 |
2-07-013-95 |
Nomenclature of computers - Withdrawn |
46 |
2-07-007-11 |
Guidelines for safty of instruments used in steel plants(Second Revision) |
47 |
2-07-024-97 |
Specification of Position switches & proximity switches (second revision) |
48 |
2-07-020-11 |
Specification for nucleonic thickness gauges(Third Revision) |
49 |
2-07-018-95 |
Air for pneumatic instruments - Withdrawn in Favor of IPSS 2-07-095-14 |
50 |
2-07-016-93 |
Instrument panels - Withdrawn |